Within Aladağ Rüzgar Enerji Üretim San. ve Tic. A.Ş., Kuyulukoyak Wind Power Plant (RES) continues uninterrupted energy generation since 2020, leveraging the strong winds of Konya’s highlands with an installed capacity of 16 MWe.
Construction of the Makres Solar Power Plant began in April 2017 in Alanya, Antalya, and the facility—together with the Energy Transmission Line—was commissioned within 4 months with an installed capacity of 5,830 kWp / 5,000 MWe.
The Başköy Regulator and Hydroelectric Power Plant (HES) Project, under KC Elektrik Üretim A.Ş., is located in Başköy, Araç district of Kastamonu Province, on a tributary of the Araç Stream, and our facility is currently under construction.
Within the scope of the solid waste project carried out by the Solid Waste Facility Construction and Operation Union of the local administrations of Trabzon and Rize; separate collection of packaging waste generated in the provinces of Trabzon and Rize.